Bridges took responsibility for the full detailed MEICA design and installation of the UV plant and ancillary equipment. This included a vacuum siphon loop system designed to instantaneously break high flows and prevent forward flow of invalidated water. Bridges was also tasked with designing a Phosphoric Acid Cleaning System for the UV reactors which could be operated without having to strip the reactors down.